Sea Tech

 

 

RUS

rus

ENG

eng

 
| NEWS | ABOUT SEA TECH | SERVICES | REFERENCE LIST | PARTNERS | CONTACTS |

Судостроительная компания Си Тех

 

 
 
 

Floating dock

Project  28140

Conceptual & detailed design

 
Floating dock plan

design

deсk plans

characteristics

specification

photo from yard

final photo

 

 

 

 

General Arrangement:

The dock consists of six square-shaped metal-fabricated pontoons with the pontoon deck and two continuous and inseparable metal-fabricated wing walls each having a top deck and a safety deck. Communication between the wing walls is through a catwalk in the forу part of the dock.

The pontoons and wing walls are subdivided into 20 ballast tanks, 6 voids and 8 non-watertight compartments.

Inside the SB wing wall there are accommodation spaces (cabins and dining room, offices, WCs etc.), storerooms and foam fire extinguishing plant room. Arranged in the PS wing wall are machinery and special electrical spaces, pump room, machinery store, workshop, yard personnel accommodation spaces (foreman's office, WCs etc.) and foam fire extinguishing rooms. Amount of supplies enables work endurance for the crew and yard personnel of two 8-hour shifts.

Arranged at fore and aft parts are end closures (liftable ramps) operated by means of capstans.  

 

Copyright © SeaTech All Rights Reserved®